dianalee@supanchor.com
supanchor@vip.163.com
Skype: supanchor88
+86 139 8088 1086  (7*24 hours)
+86 28 8694 1780
+86 28 8722 9128
Eastern  plant: 1.5 hours to Shanghai Port
Western plant: 1 hour to Chengdu International
Airport
SupStory: The Eastern Plant of SupAnchor set up in 2009

In July 2009, the Eastern Plant invested fully by SupAnchor ® was put into operation after 10 months of construction. By this investment, the freight cost was saved by 85%, and domestic transportation time was reduced from 5 days to 2 hours. 
The total land of Eastern Plant is 23,300 m2. The designed annual capacity for SupAnchor self drilling anchor bars is 5,000,000 meters and for SupHulkTM swell friction rock bolts is 600,000 meters.

 

Key Words:
Self drilling anchor bar
Self drilling anchor bolt
Self drilling anchor system 

quality self drilling anchor system in China

 

 


Previous: SupStory: SupAnchor Experienced the 5.12 Wenchuan Earthquake
        Next: SupStory: The First Western Plant of SupAnchor set up in 1994

二维码
Home