dianalee@supanchor.com
supanchor@vip.163.com
Skype: supanchor88
+86 139 8088 1086  (7*24 hours)
+86 28 8694 1780
+86 28 8722 9128
Eastern  plant: 1.5 hours to Shanghai Port
Western plant: 1 hour to Chengdu International
Airport
SupStory: SupAnchor and Its Engineering Clients in the Hard-hit Areas in 2008

On May 12th, 2008, an earthquake which measured 8.0 magnitude occurred, and the rank of intensity reached 11. Not only did China experience the terrible effect of it, but many Asia countries felt it as well. After the earthquake, SupAnchor sent 3 engineers to hurry to the Zipingpu Reservoir Slope Project and Longchi Tunnelling Project, providing on-site help and services. The two sites widely used products produced by SupAnchor, such as self-drilling anchor bolts, anchor bits, couplers. We felt sorry about their tragedy, meanwhile we felt very proud that the application functioned well in both sits, reliable enough to withstand this huge test.
During the following month, SupAnchor applied anchor bolts and accessaries to these spots for the need of the roads, tunnels and other emergency constructions.

 

Key Words:
Self drilling anchor bar
Self drilling anchor bolt
Self drilling anchor system 

quality self drilling anchor system in China

 

 


Previous: none!
        Next: SupStory: SupAnchor Experienced the 5.12 Wenchuan Earthquake

二维码
Home