dianalee@supanchor.com
supanchor@vip.163.com
Skype: supanchor88
+86 139 8088 1086  (7*24 hours)
+86 28 8694 1780
+86 28 8722 9128
Eastern  plant: 1.5 hours to Shanghai Port
Western plant: 1 hour to Chengdu International
Airport
SupAnchor SDA Bars In the Application of La-Lin Highway of Tibet

The under-construction La-Lin Highway of Tibet, is the main traffic artery that connects the center and the east of Tibet.

With total length of 409.2km divided into 10 sections, the highway transits from 3,750m sea level to 2,700m sea level, passing through Mount Mila with over 5,000m sea level, with high construction standard and difficulty of operation. 

According to the requirement of site work, massif, strata of each section of La-Lin Highway, SupAnchor designed and manufactured R32N SDA Bar, R25 Expansion Shell Bar, FRP Bar and accessories with safer performance.

There have been over 20,000 meters of SupAnchor bars and accessories currently in the application of tunneling, slope stabilization of 7 sections of La-Lin Highway.

The following construction requires the production of bars and accessories to proceed as planned. 

 
 
 


Learn More:
Self drilling anchor bar
Self drilling anchor bolt
Self drilling anchor system
Self drilling hollow bar


Previous: SupAnchor Quality Management Upgrading Project (QMUP)
        Next: The Construction of the Second Airport of Chengdu Is Approved

二维码
Home