SupAnchor’s “Rhythm in London”

  • 0
201411241718559108

SupAnchor’s “Rhythm in London”

Category : Happy broadcast

With the combination of reliable anchor bolt production capacity, sufficient delivery plan, and accurate logistics service, SupAnchor is able to provide a shorter delivery period for customers. area in the east plant of SupAnchor became a fog city on November 22, 2014, and had the visibility of less than 15 meters. We must know that this is an important factory of SupAnchor for manufacturing self drilling anchor bolts. It is in this plant that 20,000 meters of anchor bars in all specifications are manufactured each day.
For the purpose of meeting the delivery term, SupAnchor launched a warning plan with the code name of “The Rhythm of London” prior to the arrival of the heavy fog. All workshops, quality inspection department, and transportation department have made swift reaction according to the weather forecast. All vehicles have arrived at the factory the night before the fog to start loading and transporting goods overnight. By the afternoon on the 22nd, when the heavy fog dispersed, the second fleet of trucks fully loaded with anchor bolts of all specifications drove to Shanghai port for meeting the needs of geotechnical engineering projects around the world.
With the combination of reliable anchor bolt production capacity, sufficient delivery plan, and accurate logistics service, SupAnchor is able to provide a shorter delivery period for customers.

201411241718559108


Leave a Reply