self drilling anchor system application of the end of the tunnel for Vancouver water projects

A decade-long construction project to allow for the continued supply of safe, high-quality drinking water in Metro Vancouver is 99 per cent complete.
Home - Industry News - self drilling anchor system application of the end of the tunnel for Vancouver water projects
self drilling anchor system application of the end of the tunnel for Vancouver water projects
Industry News
2022-10-08
3510

A decade-long construction project to allow for the continued supply of safe, high-quality drinking water in Metro Vancouver is 99 per cent complete.

The Seymour and Capilano watersheds supply Metro Vancouver residents and businesses with 70 per cent of their drinking water.
Of the five major project components, only the twin tunnels and the energy recovery facility remain to be finished. Overall project completion is expected in early 2015.

Construction is complete on the Capilano pumping station, which is being maintained in operational readiness until completion of the twin tunnels that will deliver water to and from the filtration plant. Construction is also complete on the break head tank facility, the filtration plant and clearwells that store treated water.

The twin tunnels are 98 per cent complete. Tunnel filling is expected to commence in mid-November followed by flushing and commissioning from December through February.

Each of the twin tunnels will be 3.8 metres in diameter, 7.1 kilometres long and 160 to 640 metres below ground level. These massive tunnels, including the shafts, took six years to excavate, one year to install the permanent support and two years to line.

As the Seymour-Capilano Filtration Plant is higher in elevation than the Capilano Reservoir, excess pressure will be generated when treated water is returned through the treated water tunnel. Using a new energy recovery facility and its turbine, energy will be harnessed from the excess pressure. This energy will be used to partially offset the power requirements.

Recommend
Self Drilling Anchor System Overcomes Complex Ground Conditions in European Infrastructure Upgrade

SupAnchor's self drilling anchor bolts and hollow bar anchors support a large-scale European infrastructure project, overcoming difficult ground conditions with high-efficiency drill-and-grout technology.

SupAnchor Launches Grade 75 Self-Drilling Hollow Anchor for High-Capacity Geotechnical Works

SupAnchor introduces Grade 75 self-drilling hollow anchor, offering enhanced load capacity for heavy infrastructure, tunneling, and slope stabilization projects.

SupAnchor Self-Drilling Anchor System Enhances Safety in Challenging Highway Slope Stabilization

Innovative self-drilling anchor bolts from SupAnchor overcome complex geology in a major transportation project, demonstrating high tensile strength and corrosion resistance.

SupAnchor Unveils High-Performance GFRP Mesh for Corrosion-Resistant Reinforcement in Global Infrastructure

SupAnchor introduces its SupFRP® GFRP Mesh, a lightweight, non-conductive, and corrosion-resistant alternative to welded metal mesh, designed for roof protection, concrete repair, and highway overlays.

SupAnchor Self Drilling Anchor System Overcomes Difficult Geology on Critical Highway Slope Project

Fractured rock and steep terrain challenged highway slope stability. SupAnchor's self drilling anchor system, employing hollow bar anchors, delivered rapid, reliable ground reinforcement.

Tongzhou Bay, Binhai New Village, Sanyu District, Nantong City, Jiangsu 226300, China
No.13 Jin Teng Road, Economy Zone, Dujiangyan Sichuan 611833, China