The under-construction La-Lin Highway of Tibet, is the main traffic artery that connects the center and the east of Tibet.
With total length of 409.2km divided into 10 sections, the highway transits from 3,750m sea level to 2,700m sea level, passing through Mount Mila with over 5,000m sea level, with high construction standard and difficulty of operation.
According to the requirement of site work, massif, strata of each section of La-Lin Highway, SupAnchor designed and manufactured R32N SDA Bar, R25 Expansion Shell Bar, FRP Bar and accessories with safer performance.
There have been over 20,000 meters of SupAnchor bars and accessories currently in the application of tunneling, slope stabilization of 7 sections of La-Lin Highway.
The following construction requires the production of bars and accessories to proceed as planned.

SupAnchor's innovative self drilling anchor bolt system provides robust geotechnical reinforcement, addressing complex geological challenges in modern infrastructure projects across Europe and America.
SupAnchor introduces its GFRP Dowel Bar, offering superior load transfer, corrosion resistance, and a 100+ year service life for pavements and sensitive environments.
A European infrastructure project overcomes soil instability with SupAnchor's self drilling anchor system, highlighting innovation in geotechnical reinforcement for tunneling and slope stabilization.
SupAnchor introduces a GFRP tie rod for formwork, featuring high corrosion resistance, permanent installation, and cost savings, supporting sustainable construction practices in global infrastructure.
A major infrastructure project in Europe leverages SupAnchor's self drilling anchor bolts for slope stabilization and foundation support in complex geological conditions.