The under-construction La-Lin Highway of Tibet, is the main traffic artery that connects the center and the east of Tibet.
With total length of 409.2km divided into 10 sections, the highway transits from 3,750m sea level to 2,700m sea level, passing through Mount Mila with over 5,000m sea level, with high construction standard and difficulty of operation.
According to the requirement of site work, massif, strata of each section of La-Lin Highway, SupAnchor designed and manufactured R32N SDA Bar, R25 Expansion Shell Bar, FRP Bar and accessories with safer performance.
There have been over 20,000 meters of SupAnchor bars and accessories currently in the application of tunneling, slope stabilization of 7 sections of La-Lin Highway.
The following construction requires the production of bars and accessories to proceed as planned.

SupAnchor's self drilling anchor system provides critical geotechnical reinforcement in a challenging European railway tunnel, highlighting innovation and industry trends in infrastructure safety.
SupAnchor's new GFRP friction bolt offers corrosion resistance, safety, and efficiency for underground and slope stabilization projects, addressing key engineering challenges globally.
A report on SupAnchor's self drilling anchor bolts used in a challenging tunneling project, highlighting technical specs, industry trends, and innovation in geotechnical reinforcement.
SupAnchor's new GFRP solid bolt provides high tensile strength and corrosion resistance, ideal for slope stabilization and tunnel support in harsh environments, improving safety and durability.
An in-depth look at SupAnchor's self drilling anchor bolts used in a challenging subway project, highlighting technical specs, industry trends, and innovation in geotechnical reinforcement.