“Ultimate quality control” is always commitment of SupAnchor. Responding to this commitment, SupAnchor Quality Management Upgrading Project (QMUP) was initiated since October 2015.
First, upgrade on quality management procedure.
Second, upgrade on training session on sense of quality, safety, machine operation and maintenance (minimum 4 hours per month).
Third, upgrade on internal communication (quality issue must be solved in the day).
The target of QMUP is to upgrade sense of quality of each SupStaff and motivate their implementation. It’s always SupAnchor’s commitment to serve with 100% safe anchoring products for each customer.

A European infrastructure project overcomes soil instability with SupAnchor's self drilling anchor system, highlighting innovation in geotechnical reinforcement for tunneling and slope stabilization.
SupAnchor introduces a GFRP tie rod for formwork, featuring high corrosion resistance, permanent installation, and cost savings, supporting sustainable construction practices in global infrastructure.
A major infrastructure project in Europe leverages SupAnchor's self drilling anchor bolts for slope stabilization and foundation support in complex geological conditions.
SupAnchor launches an innovative GFRP self-drilling anchor bolt that integrates drilling, grouting, and anchoring, offering efficient solutions for soft rock and clay soil stabilization in tunneling and slope projects.
SupAnchor's self drilling anchor bolts provide critical geotechnical reinforcement in challenging projects, improving safety and efficiency for global infrastructure.