The 3rd 5S Workshop Management Training Session was conducted in SupAnchor’s Western Plant

The 3rd 5S Workshop Management Training Session was conducted in SupAnchor’s Western Plant on July 22nd.
Home - SupNews - The 3rd 5S Workshop Management Training Session was conducted in SupAnchor’s Western Plant
The 3rd 5S Workshop Management Training Session was conducted in SupAnchor’s Western Plant
SupNews
2022-10-08
4767

 The 3rd 5S Workshop Management Training Session was conducted in SupAnchor’s Western Plant on July 22nd.

 The main subject was On-site Management of Production Tools. The Production, QC and Warehouse Team participated in the training.

 Mr. Sun from SupFRP(FRP Self Drilling Hollow Bar) Workshop said:” As one of the members of SupAnchor 5S Management Committee, I am very pleased and proud to see our tidy workshop.”

Recommend
Innovative Self Drilling Anchor System Enhances Geotechnical Safety in Major European Rail Tunnel Project

SupAnchor's self drilling anchor bolt system provides critical geotechnical reinforcement in a challenging Alpine tunnel project, improving infrastructure safety and efficiency.

SupAnchor Launches High-Strength SupUTS Self-Drilling Hollow Anchor for Demanding Geotechnical Projects

SupAnchor unveils the SupUTS self-drilling hollow anchor, featuring enhanced load capacity and a 3-in-1 design for efficient construction in challenging soil conditions.

SupAnchor's Self Drilling Anchor System Revolutionizes Geotechnical Engineering Projects

An in-depth look at how SupAnchor's self drilling anchor bolts address complex construction challenges, highlighting technical specs, industry trends, and brand value.

SupAnchor Unveils T Thread Self-Drilling Hollow Anchor for Enhanced Geotechnical Projects

SupAnchor launches the T thread self-drilling hollow anchor, featuring integrated drilling and grouting to reduce time and improve stability in tunneling and slope projects globally.

SupAnchor's Self Drilling Anchor System Enhances Geotechnical Safety in European Tunnel Project

A case study on SupAnchor's self drilling anchor system providing efficient ground stabilization for a challenging European tunneling project, with technical insights and industry relevance.

Tongzhou Bay, Binhai New Village, Sanyu District, Nantong City, Jiangsu 226300, China
No.13 Jin Teng Road, Economy Zone, Dujiangyan Sichuan 611833, China