SupAnchor Self Drilling Hollow Bar overcame “obstacle” of Macedonia KO highway

Home - Engineering - SupAnchor Self Drilling Hollow Bar overcame “obstacle” of Macedonia KO highway
SupAnchor Self Drilling Hollow Bar overcame “obstacle” of Macedonia KO highway
Engineering
2022-10-18
15615

The stratum of Macedonia KO Highway was very complicated with extremely loose and collapsed rock foundation.  Solid steel bar can’t support post-reinforcement construction.

Under such circumstances, China Hydropower Engineering Bureau was decided to use SupAnchor Self Drilling Hollow Anchor System which is combined by drilling, grouting and anchoring in one. By using SupAnchor system, the difficult stratus was overcome.

Recommend
Innovative Self Drilling Anchor System by SupAnchor Secures Major European Tunneling Project Amid Challenging Geology

A report on SupAnchor's self drilling anchor system application in a complex Alpine tunneling project, highlighting technical parameters and industry impact for infrastructure stability.

SupAnchor's Grade 75 Self-Drilling Hollow Anchor Bars Redefine Slope Stabilization in Hydropower Projects

SupAnchor introduces Grade 75 self-drilling hollow anchor bars, engineered for hydropower station slope stabilization, offering ASTM-compliant performance and improved bond efficiency in challenging geotechnical applications.

SupAnchor Self Drilling Anchor System Advances Geotechnical Stability in Major Infrastructure Project

Industry news on SupAnchor's self drilling anchor bolt application in a complex geology tunnel project, featuring technical parameters and global relevance.

SupAnchor® GFRP Reinforcement Rebar Revolutionizes Concrete Reinforcement for Sustainable Infrastructure

SupAnchor introduces high-performance GFRP reinforcement rebar, offering superior corrosion resistance and tensile strength for diverse construction needs in harsh environments.

SupAnchor's Self Drilling Anchor System Enhances Stability in Major Hydropower Plant Construction

SupAnchor's self drilling anchor systems provide critical ground stabilization in a challenging hydropower project, highlighting innovation in geotechnical engineering for infrastructure development.

Tongzhou Bay, Binhai New Village, Sanyu District, Nantong City, Jiangsu 226300, China
No.13 Jin Teng Road, Economy Zone, Dujiangyan Sichuan 611833, China