“Ultimate quality control” is always commitment of SupAnchor. Responding to this commitment, SupAnchor Quality Management Upgrading Project (QMUP) was initiated since October 2015.
First, upgrade on quality management procedure.
Second, upgrade on training session on sense of quality, safety, machine operation and maintenance (minimum 4 hours per month).
Third, upgrade on internal communication (quality issue must be solved in the day).
The target of QMUP is to upgrade sense of quality of each SupStaff and motivate their implementation. It’s always SupAnchor’s commitment to serve with 100% safe anchoring products for each customer.

Industry news on SupAnchor's self drilling anchor bolt deployment in a challenging European slope stabilization project, featuring technical specs and global geotechnical trends.
SupAnchor's GFRP Mesh offers high strength, corrosion resistance, and non-conductivity, ideal for construction applications like concrete repair and highway overlays, enhancing safety and longevity.
A report on SupAnchor's self-drilling anchor system addressing soil instability in a tunneling project, with technical specs and industry impact for geotechnical engineering.
SupAnchor launches Sup2000 and Sup5000 SDA grout pumps, offering high-performance solutions for tunneling, mining, and infrastructure projects with advanced technical features.
A large-scale tunneling project in the Alps employs SupAnchor's self drilling anchor system for slope stabilization, highlighting innovation in geotechnical reinforcement for European infrastructure.