“Ultimate quality control” is always commitment of SupAnchor. Responding to this commitment, SupAnchor Quality Management Upgrading Project (QMUP) was initiated since October 2015.
First, upgrade on quality management procedure.
Second, upgrade on training session on sense of quality, safety, machine operation and maintenance (minimum 4 hours per month).
Third, upgrade on internal communication (quality issue must be solved in the day).
The target of QMUP is to upgrade sense of quality of each SupStaff and motivate their implementation. It’s always SupAnchor’s commitment to serve with 100% safe anchoring products for each customer.

The Brenner Base Tunnel project in the Alps employed SupAnchor's self drilling anchor bolts to overcome fractured rock and water inflows, demonstrating the value of advanced geotechnical reinforcement systems.
SupAnchor's T thread self-drilling hollow anchor system integrates drilling, grouting, and reinforcement in one step, delivering high load capacity and corrosion resistance for tunnels, slopes, and foundations worldwide.
A major infrastructure project in the Alps successfully utilized SupAnchor's self-drilling anchor system to overcome fractured rock conditions, enhancing geotechnical safety and project efficiency.
SupAnchor launches a high-performance GFRP hollow injection bolt combining rock bolting and grouting, offering superior tensile load, pressure resistance, and corrosion protection for challenging geotechnical projects.
SupAnchor's self-drilling anchor system is being used in a critical slope stabilization project on a major Alpine highway expansion, overcoming difficult geology and ensuring long-term safety and infrastructure resilience.