“Ultimate quality control” is always commitment of SupAnchor. Responding to this commitment, SupAnchor Quality Management Upgrading Project (QMUP) was initiated since October 2015.
First, upgrade on quality management procedure.
Second, upgrade on training session on sense of quality, safety, machine operation and maintenance (minimum 4 hours per month).
Third, upgrade on internal communication (quality issue must be solved in the day).
The target of QMUP is to upgrade sense of quality of each SupStaff and motivate their implementation. It’s always SupAnchor’s commitment to serve with 100% safe anchoring products for each customer.

SupAnchor's self-drilling anchor system secures a steep slope for a railway expansion in the Alps, overcoming fractured rock and tight deadlines.
SupAnchor's new T thread self-drilling hollow anchor offers integrated drilling and grouting, optimized bonding, and three anti-corrosion options for tunneling, slope, and foundation projects.
A challenging slope stabilization project in the Alps utilizes SupAnchor’s self drilling anchor system to ensure long-term road safety, showcasing advanced geotechnical reinforcement technology.
SupAnchor's new SupCT Bolt System offers duplex corrosion protection and high ductility for rock support, with steel and GFRP options. Ideal for tunneling and mining.
A challenging alpine tunnel project in Switzerland employs SupAnchor's self drilling anchor system to stabilize fractured rock, enhancing safety and efficiency in geotechnical reinforcement.