“Ultimate quality control” is always commitment of SupAnchor. Responding to this commitment, SupAnchor Quality Management Upgrading Project (QMUP) was initiated since October 2015.
First, upgrade on quality management procedure.
Second, upgrade on training session on sense of quality, safety, machine operation and maintenance (minimum 4 hours per month).
Third, upgrade on internal communication (quality issue must be solved in the day).
The target of QMUP is to upgrade sense of quality of each SupStaff and motivate their implementation. It’s always SupAnchor’s commitment to serve with 100% safe anchoring products for each customer.

A Pacific Northwest highway expansion project leverages SupAnchor's hollow bar anchor systems to overcome unstable geology, highlighting advances in geotechnical reinforcement.
SupAnchor’s new Sup2000 and Sup5000 grout pumps deliver up to 6000 L/h with 120 m range, designed for demanding injection, anchoring, and backfilling in tunnels, mines, and excavations.
SupAnchor's self drilling anchor bolts provide efficient geotechnical reinforcement for a critical construction site, demonstrating advanced hollow bar anchor technology in challenging ground conditions.
SupAnchor introduces its SupFRP GFRP Hollow Injection Bolt, combining high tensile strength, corrosion resistance, and efficient grouting for slope stabilization and tunneling projects worldwide.
SupAnchor's self drilling anchor bolts provide efficient ground stabilization and slope support for a major highway project, demonstrating advanced geotechnical reinforcement systems.