“Ultimate quality control” is always commitment of SupAnchor. Responding to this commitment, SupAnchor Quality Management Upgrading Project (QMUP) was initiated since October 2015.
First, upgrade on quality management procedure.
Second, upgrade on training session on sense of quality, safety, machine operation and maintenance (minimum 4 hours per month).
Third, upgrade on internal communication (quality issue must be solved in the day).
The target of QMUP is to upgrade sense of quality of each SupStaff and motivate their implementation. It’s always SupAnchor’s commitment to serve with 100% safe anchoring products for each customer.

A large-scale highway expansion in the Alps is using SupAnchor's self-drilling anchor system to tackle complex geology, ensuring slope stability and project efficiency.
SupAnchor's Grade 75 self-drilling hollow anchor bars, with continuous T-thread and ASTM A615 compliance, provide reliable geotechnical reinforcement for a hydropower station slope stabilization project.
A recent infrastructure project demonstrates advanced geotechnical reinforcement using SupAnchor's self drilling anchor system in challenging slope conditions, improving safety and efficiency.
A recent infrastructure project employed SupAnchor's self drilling anchor system to overcome difficult ground conditions, highlighting the technical advantages of hollow bar anchors and drill-and-grout bolts in modern geotechnical engineering.
SupAnchor introduces SupPump Sup2000 and Sup5000 grout pumps, delivering high efficiency and corrosion protection for global tunnel, mining, and slope stabilization projects.