The under-construction La-Lin Highway of Tibet, is the main traffic artery that connects the center and the east of Tibet.
With total length of 409.2km divided into 10 sections, the highway transits from 3,750m sea level to 2,700m sea level, passing through Mount Mila with over 5,000m sea level, with high construction standard and difficulty of operation.
According to the requirement of site work, massif, strata of each section of La-Lin Highway, SupAnchor designed and manufactured R32N SDA Bar, R25 Expansion Shell Bar, FRP Bar and accessories with safer performance.
There have been over 20,000 meters of SupAnchor bars and accessories currently in the application of tunneling, slope stabilization of 7 sections of La-Lin Highway.
The following construction requires the production of bars and accessories to proceed as planned.
An in-depth report on SupAnchor's self drilling anchor system enhancing geotechnical safety in European infrastructure, with technical insights and global industry impact.
SupAnchor's SupPump SDA grout pump models Sup2000 and Sup5000 deliver high performance for tunneling, mining, and civil engineering, with advanced specs solving key challenges in infrastructure projects.
SupAnchor's self drilling anchor bolt system provides robust geotechnical reinforcement for a challenging tunneling project, highlighting innovation and industry trends.
SupAnchor introduces the SupShell expansion rock bolt system, offering quick installation, immediate anchorage, and superior grip for tunneling and mining applications, adhering to international standards.
In 2025, SupAnchor employees enthusiastically participated in the Chengdu World Heritage Marathon, demonstrating the spirit of perseverance and a commitment to a healthy, dynamic corporate culture.