The under-construction La-Lin Highway of Tibet, is the main traffic artery that connects the center and the east of Tibet.
With total length of 409.2km divided into 10 sections, the highway transits from 3,750m sea level to 2,700m sea level, passing through Mount Mila with over 5,000m sea level, with high construction standard and difficulty of operation.
According to the requirement of site work, massif, strata of each section of La-Lin Highway, SupAnchor designed and manufactured R32N SDA Bar, R25 Expansion Shell Bar, FRP Bar and accessories with safer performance.
There have been over 20,000 meters of SupAnchor bars and accessories currently in the application of tunneling, slope stabilization of 7 sections of La-Lin Highway.
The following construction requires the production of bars and accessories to proceed as planned.

A large-scale tunneling project in the Alps employs SupAnchor's self drilling anchor system for slope stabilization, highlighting innovation in geotechnical reinforcement for European infrastructure.
SupAnchor introduces the Grade 75 self-drilling hollow anchor, featuring high-strength steel and the 3-in-1 principle to boost load-bearing capacity in challenging infrastructure projects.
SupAnchor's innovative self-drilling anchor system provides robust geotechnical reinforcement in a complex Alpine tunneling project, highlighting advancements in infrastructure safety and efficiency.
SupAnchor introduces its R thread self-drilling hollow anchor, integrating drilling and grouting for enhanced safety and efficiency in tunneling and ground engineering projects globally.
SupAnchor, a leading global provider of advanced geotechnical anchoring systems, proudly held the groundbreaking ceremony for its 1995kW Photovoltaic Power Station at the Eastern New Plant.