The under-construction La-Lin Highway of Tibet, is the main traffic artery that connects the center and the east of Tibet.
With total length of 409.2km divided into 10 sections, the highway transits from 3,750m sea level to 2,700m sea level, passing through Mount Mila with over 5,000m sea level, with high construction standard and difficulty of operation.
According to the requirement of site work, massif, strata of each section of La-Lin Highway, SupAnchor designed and manufactured R32N SDA Bar, R25 Expansion Shell Bar, FRP Bar and accessories with safer performance.
There have been over 20,000 meters of SupAnchor bars and accessories currently in the application of tunneling, slope stabilization of 7 sections of La-Lin Highway.
The following construction requires the production of bars and accessories to proceed as planned.

A major European infrastructure project overcomes unstable geology with SupAnchor's advanced self drilling anchor bolt technology, ensuring safety and efficiency.
A critical highway expansion project in Colorado utilized SupAnchor's self-drilling anchor system to stabilize steep rock slopes, showcasing advanced geotechnical reinforcement and efficient on-site installation.
SupAnchor unveils a high-strength, corrosion-resistant GFRP hollow injection bolt that combines grouting and anchoring in a single, lightweight system, improving safety and efficiency in tunneling and slope projects.
A major mountainous highway project overcame fractured rock and high groundwater using SupAnchor's innovative self-drilling anchor system, showcasing geotechnical reinforcement advancements.
SupAnchor introduces the SupUTS self-drilling hollow anchor, designed for heavy-duty geotechnical reinforcement with ultimate tensile strengths up to 930 kN, enhancing safety and efficiency in challenging ground conditions.